# RE Onboarding & Offboarding System: Comprehensive Alignment Report ## Prepared for: Dealer Onboarding Project ## Reference: SRS v1.4 / 2.0 (High-Fidelity) ## Current Date: April 1, 2026 --- ## 1. Executive Summary: Full Project Scope This report covers the end-to-end alignment of the Dealer Lifecycle Management system, spanning Onboarding, Offboarding (Resignation/Termination), and Self-Service (Constitutional Change/Relocation). | Goal | SRS Section | System Status | Completion % | | :--- | :--- | :--- | :--- | | **Dealer Onboarding** | Section 6 | Stable Flow (Eval -> LOI -> SAP) | 85% | | **Dealer Resignation** | Section 7 | Backend Ready; UI in progress | 50% | | **Dealer Termination** | Section 8 | Logic Ready; SCN Flow in progress | 40% | | **F&F Settlement** | Section 10/11 | Trigger Ready; Clearance Grid Pending | 20% | | **Self-Service (Constitutional)** | Section 12.2 | **PENDING** (Schema Ready) | 10% | | **Self-Service (Relocation)** | Section 12.2.6 | **PENDING** (Schema Ready) | 10% | --- ## 2. Onboarding & Evaluation (Section 6) **Owner:** DD Admin / DD ASM | Sub-Task | Demarcation Points | Status | Integration | | :--- | :--- | :--- | :--- | | **Questionnaire** | Weighted Scoring (100%), Public Link Access | βœ… COMPLETED | Real | | **Shortlisting** | Bulk Action, Assign to ASM/ZM | βœ… COMPLETED | Real | | **Interviews (L1-3)** | Panel Scheduling, KT Matrix, AI Summary | βœ… COMPLETED | AI Mocked | | **FDD Verification** | Agency Upload, Report Review by DD Head | 🚧 IN PROGRESS | Manual | | **LOI Issuance** | 3-tier Approval (Finance/DD-Head/NBH) | βœ… COMPLETED | PDF Mocked | | **Security Details** | BG & Deposit Verification (BG / SD) | 🚧 IN PROGRESS | Pending UI | | **Site Readiness** | Arch Blueprints, Statutory Docs, Dealer Code | βœ… COMPLETED | SAP Mocked | | **Go-Live** | LOA Issuance, EOR Checklist | πŸ›‘ PENDING | Logic Only | --- ## 3. Dealer Lifecycle & Self-Service (Section 12) **Owner:** Dealer (Initiation) / Legal & DD Head (Approval) ### 3.1 Dealer Resignation (Section 12.1) * **Width:** Outlet-level selection, Last Working Day (LWD) capture, Withdrawal logic. * **Status:** Backend endpoints for initiation are ready. UI needs the "Resignation Dashboard" for the dealer persona. ### 3.2 Constitutional Change Management (Section 12.2) * **Width:** Proprietorship β†’ Partnership/LLP/Pvt Ltd. * **Depth:** Dynamic document checklist (GST, PAN, Partnership Deed, COI, MOA/AOA). * **Status:** **PENDING UI**. Schema supports the different constitution types, but the multi-level internal review (ASM β†’ ZBH β†’ Legal) needs workflow orchestration. ### 3.3 Relocation Request (Section 12.2.6) * **Width:** New Site Selection (Manual/Map), Distance Tracking, Property Docs. * **Depth:** 4 Categories of Docs (Property, Legal, Statutory, Infrastructure). * **Status:** **PENDING UI**. Approval hierarchy (ASM β†’ RBM β†’ ZM β†’ NBH) is partially mapped in the assessment controller logic but requires a dedicated controller. --- ## 4. Administrative & Shared Modules (Section 9) **Owner:** Super Admin | Feature | Detailed Breakdown | Status | | :--- | :--- | :--- | | **RBAC** | Zone/Region/Area cascading hierarchy; National Role visibility. | βœ… COMPLETED | | **Opportunity** | Window-based Geography opening (State/City/District). | βœ… COMPLETED | | **SLA Config** | Warning/Escalation thresholds per stage. | 🚧 IN PROGRESS | | **Email Templates** | Trigger-based logic (Interview Scheduled, LOI Issued). | 🚧 IN PROGRESS | | **Audit Trail** | Entity-level history (what changed, by whom, old vs new). | βœ… COMPLETED | --- ## 5. Mocks & System Simulations | Item | Description | Status | | :--- | :--- | :--- | | **SAP Master** | Simulates code generation (Sales/Service) and status sync. | MOCKED | | **Gemini AI** | Simulates consensus summary paragraph generation. | MOCKED | | **WhatsApp/SMS** | Simulated via console logs for non-sensitive alerts. | MOCKED | | **Meeting Links** | Mock Google Meet link generation. | MOCKED | --- ## 6. Project Roadmap & Critical Gaps 1. **F&F Settlement Clearance Grid:** The most complex remaining logicβ€”capturing clearance from 16 departments. 2. **Legal Letter Engine:** Moving from "Marked as Generated" to real PDF generation with templates. 3. **EOR Checklist Integration:** Enabling the ASM to perform the final "On-Site" check via the mobile/web interface. --- **Status Legend:** - βœ… **COMPLETED:** Logic, UI, and Backend aligned. - 🚧 **IN PROGRESS:** Development underway; partially functional. - πŸ›‘ **PENDING:** Logic defined in SRS but not yet implemented.