# RE Workflow - CRITICAL Flow Questions for Kickoff
|
||
**Must Be Answered Before Development Starts**
|
||
|
||
---
|
||
|
||
## 🔴 SECTION 1: REQUEST SUBMISSION FLOW
|
||
|
||
### **Q1. What happens IMMEDIATELY after "Submit Request" button is clicked?**
|
||
|
||
**From SRS:** "Once submitted, the request enters the Approval Workflow and notifies the first approver."
|
||
|
||
**CRITICAL QUESTIONS:**
|
||
- [ ] Does request go DIRECTLY to Level 1 approver, or is there a review/validation step?
|
||
- [ ] Can initiator cancel/recall request after submission but before any approver acts?
|
||
- [ ] Is request immediately visible to ALL approvers, or ONLY Level 1?
|
||
- [ ] Can initiator edit request after submission? (Before any approvals)
|
||
|
||
**Why Critical:** Affects database state, notification triggers, and user expectations.
|
||
|
||
**Decision:** _______________________
|
||
|
||
---
|
||
|
||
## 🔴 SECTION 2: APPROVAL REJECTION FLOW
|
||
|
||
### **Q2. When approver REJECTS - what EXACTLY happens to the request?**
|
||
|
||
**From SRS:** "Reject Request – Sends remarks to the initiator and marks as closed."
|
||
|
||
**CRITICAL QUESTIONS:**
|
||
- [ ] **Option A:** Request permanently CLOSED (cannot be reopened)?
|
||
- [ ] **Option B:** Request goes back to initiator as DRAFT (can modify and resubmit)?
|
||
- [ ] **Option C:** Request goes back to PREVIOUS level for reconsideration?
|
||
- [ ] **Option D:** Request CANCELLED (like it never existed)?
|
||
|
||
**If rejected at Level 3 (out of 5 levels):**
|
||
- Do Level 4 and 5 approvers see it was rejected?
|
||
- Or does it just disappear from their pending list?
|
||
|
||
**Why Critical:** Affects entire workflow state machine and database design.
|
||
|
||
**Decision:** _______________________
|
||
|
||
---
|
||
|
||
## 🔴 SECTION 3: FINAL APPROVAL & CLOSURE SEQUENCE
|
||
|
||
### **Q3. After FINAL approver approves - what is the exact closure sequence?**
|
||
|
||
**From SRS:** "After final approval, the request returns to the Initiator with AI-generated conclusion remarks."
|
||
|
||
**CRITICAL SEQUENCE QUESTIONS:**
|
||
|
||
**Step 1:** Final approver clicks "Approve" → What happens?
|
||
- [ ] Request status changes to "Approved" immediately?
|
||
- [ ] Or status is "Pending Closure" until initiator acts?
|
||
|
||
**Step 2:** AI generates conclusion remarks → When?
|
||
- [ ] Immediately after final approval?
|
||
- [ ] Or when initiator opens the request?
|
||
|
||
**Step 3:** Request "returns to initiator" → How?
|
||
- [ ] Initiator gets notification to "close" the request?
|
||
- [ ] Or it just appears in their "Approved" list?
|
||
|
||
**Step 4:** Initiator must act → Required or optional?
|
||
- [ ] **Option A:** Initiator MUST review and click "Close" (workflow not complete until then)?
|
||
- [ ] **Option B:** Auto-closed, initiator can OPTIONALLY edit conclusion?
|
||
|
||
**Why Critical:** Affects workflow completion logic and user responsibilities.
|
||
|
||
**Decision:** _______________________
|
||
|
||
---
|
||
|
||
## 🔴 SECTION 4: TAT CALCULATION ACROSS LEVELS
|
||
|
||
### **Q4. How does TAT work when request moves between levels?**
|
||
|
||
**From SRS:** "TAT starts only when a request reaches that approver's level."
|
||
|
||
**CRITICAL SCENARIO:**
|
||
|
||
```
|
||
Request Flow:
|
||
- Level 1: 2 days TAT → Takes 3 days (1 day overdue)
|
||
- Level 2: 1 day TAT → Takes 1 day (on time)
|
||
- Level 3: 2 days TAT → Takes 2 days (on time)
|
||
```
|
||
|
||
**QUESTIONS:**
|
||
- [ ] **Total TAT:** Is it 5 days (2+1+2) or 6 days (3+1+2 actual)?
|
||
- [ ] **Reporting:** Does Level 1 delay affect overall TAT status?
|
||
- [ ] **Visibility:** Does Level 2 approver see that Level 1 was late?
|
||
- [ ] **Level 1 TAT breach:** Who gets notified? (Initiator, Manager, Admin?)
|
||
|
||
**Why Critical:** Affects TAT calculation logic, database schema, and reporting.
|
||
|
||
**Decision:** _______________________
|
||
|
||
---
|
||
|
||
## 🔴 SECTION 5: WORK NOTES vs APPROVAL COMMENTS
|
||
|
||
### **Q5. What's the difference between Work Notes and Approval Comments?**
|
||
|
||
**From SRS:**
|
||
- "Each action requires comments and remarks (mandatory)" - Approval Comments
|
||
- "Participants communicate via the Work Notes (Chat View)" - Work Notes
|
||
|
||
**CRITICAL QUESTIONS:**
|
||
|
||
**Approval Comments (when clicking Approve/Reject):**
|
||
- [ ] Visible to everyone or only certain roles?
|
||
- [ ] Can be edited after posting?
|
||
- [ ] Part of official audit trail?
|
||
|
||
**Work Notes (ongoing discussion):**
|
||
- [ ] Can be added ANYTIME during workflow (before approvals)?
|
||
- [ ] Visible to all participants immediately?
|
||
- [ ] Are Work Notes considered when approver makes decision?
|
||
|
||
**Scenario:** Approver wants clarification before approving
|
||
- Should they use Work Notes to ask questions?
|
||
- Or use "Send Back" action (if it exists)?
|
||
- Or reject with comment "need more info"?
|
||
|
||
**Why Critical:** Affects UI design and user behavior expectations.
|
||
|
||
**Decision:** _______________________
|
||
|
||
---
|
||
|
||
## 🔴 SECTION 6: SPECTATOR ROLE & PERMISSIONS
|
||
|
||
### **Q6. What EXACTLY can spectators do vs not do?**
|
||
|
||
**From SRS:** "Spectators (view-only participants) who can comment but not approve."
|
||
|
||
**CRITICAL PERMISSION QUESTIONS:**
|
||
|
||
**Can Spectators:**
|
||
- [ ] Add Work Notes / Comments? (**SRS says YES "can comment"**)
|
||
- [ ] Upload documents/files?
|
||
- [ ] @mention other users?
|
||
- [ ] Add more spectators?
|
||
- [ ] See approval comments from approvers?
|
||
- [ ] See Activity log (all actions)?
|
||
- [ ] Download documents?
|
||
|
||
**Can Spectators be added:**
|
||
- [ ] Only during request creation (Step 4)?
|
||
- [ ] Anytime during workflow (by initiator or approver)?
|
||
- [ ] Even after request is closed?
|
||
|
||
**Why Critical:** Affects access control, UI rendering, and feature availability.
|
||
|
||
**Decision:** _______________________
|
||
|
||
---
|
||
|
||
## 🔴 SECTION 7: ACTIVITY LOG vs WORK NOTES
|
||
|
||
### **Q7. Activity Tab vs Work Notes - what goes where?**
|
||
|
||
**From SRS:**
|
||
- "Activity Tab" - Every event captured with timestamps
|
||
- "Work Notes" - Chat view for collaboration
|
||
|
||
**CRITICAL QUESTIONS:**
|
||
|
||
**Activity Tab shows:**
|
||
- [ ] System events ONLY (request created, approved, TAT breach)?
|
||
- [ ] System events + Work Notes messages?
|
||
- [ ] System events + Approval comments?
|
||
- [ ] Everything (all-in-one timeline)?
|
||
|
||
**Work Notes shows:**
|
||
- [ ] Only manual messages from users?
|
||
- [ ] Messages + file uploads?
|
||
- [ ] Messages + @mentions + reactions?
|
||
|
||
**Scenario:** User adds a comment via Work Notes
|
||
- Does it appear in Activity Tab too?
|
||
- Or only in Work Notes section?
|
||
|
||
**Why Critical:** Affects data modeling and UI tab content.
|
||
|
||
**Decision:** _______________________
|
||
|
||
---
|
||
|
||
## 🔴 SECTION 8: DOCUMENT UPLOAD TIMING
|
||
|
||
### **Q8. When can documents be uploaded - only during creation or anytime?**
|
||
|
||
**From SRS:** "Step 5: Documents & Attachments" + "Work Notes supports file sharing"
|
||
|
||
**CRITICAL QUESTIONS:**
|
||
|
||
**During Request Creation (Step 5):**
|
||
- [ ] Initiator uploads supporting documents
|
||
- [ ] Are these the ONLY "official" documents?
|
||
|
||
**After Submission:**
|
||
- [ ] Can initiator add more documents? (If yes, until when?)
|
||
- [ ] Can approvers add documents? (E.g., approval memos, signatures?)
|
||
- [ ] Can spectators add documents?
|
||
|
||
**Via Work Notes:**
|
||
- [ ] Files attached in Work Notes - are they "official" documents?
|
||
- [ ] Or just "discussion" attachments?
|
||
- [ ] Do they appear in Documents Tab or only Work Notes?
|
||
|
||
**Why Critical:** Affects document versioning, storage structure, and permissions.
|
||
|
||
**Decision:** _______________________
|
||
|
||
---
|
||
|
||
## 🔴 SECTION 9: OPEN REQUESTS vs CLOSED REQUESTS
|
||
|
||
### **Q9. What determines if request appears in "Open" vs "Closed" lists?**
|
||
|
||
**From SRS:** Side menu has "Open Requests" and "Closed Requests"
|
||
|
||
**CRITICAL QUESTIONS:**
|
||
|
||
**"Open Requests" shows:**
|
||
- [ ] All In Progress requests (not yet fully approved)?
|
||
- [ ] Only requests where I'm the ACTIVE approver?
|
||
- [ ] Requests I initiated that are pending?
|
||
- [ ] Requests I'm spectating that are in progress?
|
||
|
||
**"Closed Requests" shows:**
|
||
- [ ] Approved + Rejected requests?
|
||
- [ ] Only Approved requests?
|
||
- [ ] Requests where I was involved (initiator/approver/spectator)?
|
||
|
||
**Scenario:** Level 1 approves, moves to Level 2
|
||
- Does Level 1 still see it in "Open Requests"?
|
||
- Or does it move to "Closed Requests" for Level 1?
|
||
- Or moves to a "Completed Actions" section?
|
||
|
||
**Why Critical:** Affects navigation, filtering logic, and user workflow visibility.
|
||
|
||
**Decision:** _______________________
|
||
|
||
---
|
||
|
||
## 🔴 SECTION 10: MY REQUESTS - STATUS CATEGORIES
|
||
|
||
### **Q10. In "My Requests" screen - what are ALL possible statuses?**
|
||
|
||
**From SRS:** "Categorized as Total, In Progress, Approved, Rejected, and Draft."
|
||
|
||
**CRITICAL QUESTIONS:**
|
||
|
||
**"In Progress" means:**
|
||
- [ ] Submitted, waiting for approvals?
|
||
- [ ] Or also includes "Pending Closure" (final approved, waiting for initiator to close)?
|
||
|
||
**"Approved" means:**
|
||
- [ ] Final approval received + initiator closed it?
|
||
- [ ] Or just final approval (even if not closed yet)?
|
||
|
||
**Missing Status?**
|
||
- [ ] "Pending Closure" - Final approved, waiting for initiator action?
|
||
- [ ] "Cancelled" - If initiator recalls request?
|
||
|
||
**Status Transitions:**
|
||
```
|
||
Draft → In Progress → Approved → Closed?
|
||
↘ Cancelled
|
||
↘ Rejected
|
||
```
|
||
|
||
**Why Critical:** Affects status state machine and database enum values.
|
||
|
||
**Decision:** _______________________
|
||
|
||
---
|
||
|
||
## 🔴 SECTION 11: POST-CLOSURE ACTIONS
|
||
|
||
### **Q11. After request is "Closed" - what actions are still possible?**
|
||
|
||
**From SRS:** "Closed requests remain accessible to all participants and spectators."
|
||
|
||
**CRITICAL QUESTIONS:**
|
||
|
||
**Can users still:**
|
||
- [ ] Add Work Notes / Comments? (Continue discussion?)
|
||
- [ ] Upload documents?
|
||
- [ ] Add new spectators?
|
||
- [ ] Edit conclusion remarks?
|
||
- [ ] View all history (Activity + Work Notes)?
|
||
- [ ] Download documents?
|
||
|
||
**Can Closed request be:**
|
||
- [ ] Reopened (moved back to In Progress)?
|
||
- [ ] Archived (moved to separate storage)?
|
||
- [ ] Deleted (by initiator or admin)?
|
||
|
||
**Why Critical:** Affects immutability rules and audit compliance.
|
||
|
||
**Decision:** _______________________
|
||
|
||
---
|
||
|
||
## 🔴 SECTION 12: PARALLEL WORKFLOWS
|
||
|
||
### **Q12. Can same approver have multiple roles in one workflow?**
|
||
|
||
**From SRS:** Up to 10 approval levels can be defined.
|
||
|
||
**CRITICAL SCENARIOS:**
|
||
|
||
**Scenario A:** Same person at multiple levels
|
||
- Level 1: John Smith
|
||
- Level 3: John Smith
|
||
- Is this ALLOWED or BLOCKED?
|
||
|
||
**Scenario B:** Initiator as Approver
|
||
- Initiator: John Smith
|
||
- Level 2 Approver: John Smith
|
||
- Should system warn: "You cannot approve your own request"?
|
||
|
||
**Scenario C:** Approver as Spectator
|
||
- Level 2 Approver: John Smith
|
||
- Also added as Spectator
|
||
- Is this redundant or okay?
|
||
|
||
**Why Critical:** Affects validation rules and conflict detection.
|
||
|
||
**Decision:** _______________________
|
||
|
||
---
|
||
|
||
## 🔴 SECTION 13: PRIORITY (EXPRESS vs STANDARD)
|
||
|
||
### **Q13. Does Priority affect anything OTHER than TAT calculation?**
|
||
|
||
**From SRS:** "Express (calendar days) vs Standard (working days)"
|
||
|
||
**CRITICAL QUESTIONS:**
|
||
|
||
**Does Priority affect:**
|
||
- [ ] UI display (badge, color, sorting)?
|
||
- [ ] Notification urgency (Express gets immediate, Standard batched)?
|
||
- [ ] Approver assignment (Express can go to senior approvers only)?
|
||
- [ ] Reminder frequency (Express reminded more often)?
|
||
- [ ] Search/filter options?
|
||
|
||
**Can Priority be changed:**
|
||
- [ ] By initiator before submission?
|
||
- [ ] By approver during workflow (escalate to Express)?
|
||
- [ ] Or fixed once set during creation?
|
||
|
||
**Why Critical:** Affects business rules and notification design.
|
||
|
||
**Decision:** _______________________
|
||
|
||
---
|
||
|
||
## 🔴 SECTION 14: 6-STEP WIZARD NAVIGATION
|
||
|
||
### **Q14. In the 6-step wizard - can user go back/forward freely?**
|
||
|
||
**From SRS:** "The user proceeds through a 6-step wizard"
|
||
|
||
**CRITICAL QUESTIONS:**
|
||
|
||
**Navigation Rules:**
|
||
- [ ] Must complete Step 1 before going to Step 2? (Sequential)
|
||
- [ ] Or can jump to any step? (Free navigation)
|
||
- [ ] Can go back to Step 2 from Step 5? (With data saved?)
|
||
|
||
**Data Persistence:**
|
||
- [ ] Data saved only when clicking "Save as Draft"?
|
||
- [ ] Or auto-saved when moving between steps?
|
||
|
||
**Mandatory Steps:**
|
||
- [ ] Must complete ALL 6 steps before "Submit" button appears?
|
||
- [ ] Or can skip optional steps (e.g., Documents, Spectators)?
|
||
|
||
**Scenario:** User fills Step 1-3, closes browser
|
||
- Data lost or auto-saved as draft?
|
||
|
||
**Why Critical:** Affects wizard component logic and draft handling.
|
||
|
||
**Decision:** _______________________
|
||
|
||
---
|
||
|
||
## 🔴 SECTION 15: APPROVAL COMMENTS - MANDATORY RULES
|
||
|
||
### **Q15. Comments/Remarks mandatory for BOTH Approve AND Reject?**
|
||
|
||
**From SRS:** "Each action requires comments and remarks (mandatory)."
|
||
|
||
**CRITICAL CLARIFICATION:**
|
||
|
||
**Mandatory Comments for:**
|
||
- [ ] **Approve:** YES - Must explain why approving
|
||
- [ ] **Reject:** YES - Must explain why rejecting
|
||
- [ ] Both require same min/max character limit?
|
||
|
||
**Comment Field:**
|
||
- [ ] Plain text only?
|
||
- [ ] Rich text (bold, bullets)?
|
||
- [ ] File attachments allowed with comments?
|
||
- [ ] Character limit: 500 mentioned for Reject, what about Approve?
|
||
|
||
**Scenario:** Approver tries to approve without comment
|
||
- Block action with error?
|
||
- Or just show warning (can proceed)?
|
||
|
||
**Why Critical:** Affects validation rules and UI behavior.
|
||
|
||
**Decision:** _______________________
|
||
|
||
---
|
||
|
||
## 📋 SUMMARY: TOP 15 CRITICAL FLOW DECISIONS
|
||
|
||
### **Blockers (MUST decide before development):**
|
||
1. ✅ **Rejection behavior** - Goes to draft, closed, or previous level?
|
||
2. ✅ **Closure sequence** - Who closes? Initiator or auto-closed?
|
||
3. ✅ **TAT across levels** - How to handle delays?
|
||
4. ✅ **Request status state machine** - All possible statuses and transitions?
|
||
5. ✅ **Post-closure actions** - Can users add comments after closing?
|
||
|
||
### **High Priority (Week 1):**
|
||
6. ✅ **Spectator permissions** - Exactly what can they do?
|
||
7. ✅ **Activity vs Work Notes** - What goes where?
|
||
8. ✅ **Document upload timing** - Only at creation or anytime?
|
||
9. ✅ **Open vs Closed lists** - Filter logic?
|
||
10. ✅ **Duplicate roles** - Same person in multiple roles?
|
||
|
||
### **Medium Priority (Week 2):**
|
||
11. ✅ **Priority impact** - Affects more than TAT?
|
||
12. ✅ **Wizard navigation** - Sequential or free?
|
||
13. ✅ **Comments mandatory** - For both approve and reject?
|
||
14. ✅ **Work Notes vs Approval Comments** - Difference?
|
||
15. ✅ **Submit flow** - Immediate to approver or validation?
|
||
|
||
---
|
||
|
||
## ✅ ACTION ITEMS FOR KICKOFF MEETING
|
||
|
||
**Bring this document to the meeting with stakeholders.**
|
||
|
||
**Agenda Item: Workflow Flow Decisions (45 minutes)**
|
||
|
||
1. **Rejection Flow** (10 mins) - Decide: Draft, Closed, or Back?
|
||
2. **Closure Sequence** (10 mins) - Decide: Auto or Manual?
|
||
3. **TAT Calculation** (10 mins) - Decide: How to handle delays?
|
||
4. **Status State Machine** (10 mins) - Decide: All statuses and transitions?
|
||
5. **Spectator Permissions** (5 mins) - Decide: What they can/cannot do?
|
||
|
||
**Expected Outcome:** Clear decisions on all 15 questions, documented and signed off.
|
||
|
||
---
|
||
|
||
**Document Owner:** Development Team Lead
|
||
**Priority:** 🔴 CRITICAL - Affects core workflow logic
|
||
**Status:** ⚠️ AWAITING DECISIONS
|
||
**Impact:** Cannot design database schema or state machines without these answers
|
||
|
||
|